Fareham's new West Street play area is open after an independent safety inspection. How to give feedback, what is in it, and what the scheme cost.
Fareham’s new play area on West Street is now open. Fareham Borough Council announced the opening on 7 October, after what it called “a positive independent safety inspection” and its own pre-opening checks.
Updated 8 October: the play area has opened. This story first reported, on 5 October, that it would stay shut until the council had read RoSPA’s final report.
The council says this type of play area, “designed to integrate with the landscape”, already works in Portsmouth and Southampton but is new to Fareham. It wants feedback from families as they start to use it. Officers were at the play area for part of opening day, and there is information on site about how to give feedback online.
Councillor Frair Burgess, the council’s executive member for leisure and community, said: “We have always been clear that children’s safety is paramount, which is why we wanted the reassurance of the independent safety inspection before making the final decision to open.”
“Opening the play area is not the end of the story,” she said. The council would keep monitoring how the space is used. “If there are practical enhancements that would make the space work better, we will carefully review them.”
How it got here
Before opening, the council said in a statement on 1 October that an inspection by RoSPA, the Royal Society for the Prevention of Accidents, had found the play area “fundamentally safe”. It said it would not open until it had received and considered the written report. That statement also corrected a claim circulating online that the play area was opening on 1 October.
Why people are talking about it
The council’s statement does not use the word fence. It does say there has been “a great deal of discussion about the new play area”.
The council’s own design image, published in March, shows the play surface running straight onto the paving of West Street. No boundary fence is drawn around it. West Street is the main pedestrian route between Fareham Shopping Centre and Market Quay.
On 1 October Cllr Burgess said: “This is a new type of play area for Fareham, and we recognise that people will want to see how it works in practice. Opening it will not be the end of the conversation.”
She said then that the council would keep listening once the play area is in use, and “consider whether there are practical enhancements that could make the space work better for the children and families that use it.”
What is in the new play area
The council’s West Street page says the play area is designed for children aged 3 to 12. The design image itself is labelled “age 2 to 14”. The equipment includes:
- wheelchair-accessible play units and ground-level play features
- a “Spinner Bowl” and a “Sunflower Swing” for children who seek movement
- sensory equipment aimed at neurodiverse children
- braille and communication boards for children with visual and language needs
- seating and planting around the edge
The Anvil Man sculpture, which stands at the entrance to the shopping centre, is moving into the play area, the council’s West Street page says. The play area was built by KOMPAN, a playground supplier, which won the contract after a competitive tender.
The play area it replaces was built in 2000. Its equipment dated from 2011. The council’s tender notice described that equipment as “dated and limited”, with colours that were “overly muted”.
What it cost, and how the timetable slipped
The play area is part of the first phase of the council’s plans for West Street. The council’s Executive approved that phase on 2 October 2025.
| Item | Amount |
|---|---|
| UK Shared Prosperity Fund grant | £235,146 |
| Henry Cort West Street Reserve | up to £213,000 |
| Phase 1 budget | up to £448,146 |
That budget covers more than the play area. It also pays for a replacement bandstand, new seating and planting, and lights in the trees of the Civic Gardens. The procurement put an estimated £100,000, including VAT, on the play zone alone. The contract value agreed with KOMPAN has not been published.
The Henry Cort reserve was set up for the upkeep of West Street’s Millennium scheme, or “such other scheme for the improvement of West Street” as the council undertakes.
The October 2025 report expected work to begin in January 2026. It said the Shared Prosperity Fund money had to be spent by 31 March 2026. On 20 March the council said work would start “this spring”. The council has not said publicly what the later start meant for that deadline.
What happens next
- Feedback. The council wants families to tell it how the space works. Details are on signs at the play area.
- Possible changes. The council says it will review “practical enhancements” that would make the space work better, to guide its long-term improvements.
- The rest of West Street. New seating and planting around the Tipping Scales sculpture, and the bandstand, are the other parts of phase 1.
What it means for you
- The play area is open. It is on the pedestrianised part of West Street, between Fareham Shopping Centre and Market Quay.
- If you have a view on the design, including the lack of a fence, use the feedback details on site, or contact the council on 01329 236100 or customerservicecentre@fareham.gov.uk.
- If you would rather a fenced play area, the council runs 46 across the borough. Its play areas page lists them, with the improvement programme to 2028.
- If you are in town for parking or the trains, our parking in Fareham and roadworks and travel pages are up to date.
Sources
- New West Street play area opens to families, Fareham Borough Council, 7 October 2026.
- Update on new West Street play area, Fareham Borough Council, 1 October 2026.
- Play area improvements set to begin in Spring, Fareham Borough Council, 20 March 2026, with the design visualisation.
- West Street Public Realm, Fareham Borough Council, read 5 October 2026.
- Fareham Town Centre Regeneration: West Street Public Realm, report to the Executive, 2 October 2025.
- Public realm improvements, planned procurement notice 2025/S 000-044895, Find a Tender, 31 July 2025, and its OCDS record (lot values).
- Play area improvements, Fareham Borough Council, read 5 October 2026.
Have your say